Part of the global trend to convert fossil transportation and heating fuel into renewable energy, Wiretronic and the facility owner decided to abandon the conventional heating system and install a geothermal system designed to meet future demands in terms of decreased energy consumption and facility expansion.
As the heating system has been replaced, ventilation had to be reworked to meet modern demands for control.
The old lighting systems is scheduled to be replaced with ultra-modern LED system to ensure improved working conditions and energy saving. The lighting systems has undergone a simulation exercise to ensure uniform distribution of light in all conceivable areas.
In total, the Wiretronic carbon footprint will significantly be reduced by taking all mentioned measures into account. As our business is associated with transformation from fossil fuel to electric propulsion, it is prudent to move business and facilities hand in hand into the future.